RV sites in Homer
Getting her done in spite of the rain…..
Installing more joist as he can between...
The carpenter is experienced and accurate and this is not a typical floor system install, by any means. He is doing an excellent job! This is exciting, I have been looking forward to this for awhile.
RV Site #1 and #2 are now available…..
In between the rain, setting more floor ...
Getting more joist set in between the rain, some plywood makes a good temporary platform to lay joist and cut blocking. These are 2×12 wood joist not BCI’s… ‘
Setting the first floor joist……
Setting the first floor joist… We don’t like working in the rain, there were flood warnings as well. A few wash outs along East End Road.
Making some progress on the foundation
Making some progress on the foundation slow, but accurate as possible, to get the floor framing polygon as right as possible. This all done over this strong, old, settled, out of square foundation. This has to be done for the upper floor to be square plumb and level. There will be blocking between the old […]
This beautiful RV sitting at RV Site #3…
This beautiful RV sitting at RV Site #3….. Actually these folks encouraged the folks at RV Site #2 to come with them to Homer this year, we’re glad to have them here, and their going fishing in their new boat.