Skip to main content

Making a little progress below….

Making a little progress below….

Making a little progress below…. This is pretty important to the structure, these posts are supported with helical piles 10’ into the ground. I had Charlie make 4 brackets from 1/4” x4” steel with the 1/4” offset bend in each. I through bolted the top, which goes through 4  2”x12” beam members. I will just […]

RV Sites in Homer getting dialed in…..

RV Sites in Homer getting dialed in…..

RV Sites in Homer getting dialed in….. I have been patching areas here and there with top soil and grass seed, trying not to turn the areas into just dirt. Maybe I could get the owner to till, topsoil and sod this, that’s what it really needs in a few places. Then I shouldn’t push […]

Winter today at RV Sites in Homer…….

Winter today at RV Sites in Homer…….

Winter today at RV Sites in Homer……. A look at RV Site #1 and part of #4 off to the right just seeing the stern of the Trailer on #4 anyway these roads and pipes aren’t too tall today. This was not planned…but look at the previous post about elevations. Then look at the almost […]