Making a little progress below….

This is pretty important to the structure, these posts are supported with helical piles 10’ into the ground. I had Charlie make 4 brackets from 1/4” x4” steel with the 1/4” offset bend in each. I through bolted the top, which goes through 4  2”x12” beam members. I will just lag the bottom connections.

6”x6” post to beam connections

6”x6” post to beam connections

6”x6” post to beam connections

6”x6” post to beam connections

6”x6” post to beam connections

6”x6” post to beam connections