Making a little progress below….
This is pretty important to the structure, these posts are supported with helical piles 10’ into the ground. I had Charlie make 4 brackets from 1/4” x4” steel with the 1/4” offset bend in each. I through bolted the top, which goes through 4 2”x12” beam members. I will just lag the bottom connections.