Electrical 200 amp RV Sites sub panel, This Baby is ready to energize, I might work on a better weather shelter for it
Electrical 200 amp RV Sites sub panel
Electrical 200 amp RV Sites sub panel, repositioned in between the studs, after moving 1 stud over since this framing is 12” o.c.now the panel is home and wired This wiring is temporary, obviously I have to finish the building, so I left myself lots of wire to pull it back out and modify as […]
Electrical 200 amp RV Sites sub panel
Electrical 200 amp RV Sites sub panel Well I got the panel surface mounted to the framing for now, I’ll mount some junction boxes and run wire next. Beautiful day today glad to have that trench work done.
Electrical 200 amp RV Sites sub panel tr...
Electrical 200 amp RV Sites sub panel trenching I got the trench done and the wire laid in that feeds the sub-panel, now to install the sub-panel and Junction boxes to feed the individual RV Sites with 50 amps.
Base road and pad for RV Site #2
Base road and pad for RV Site #2 I’ll trim down those Alders on the left as I did everywher else opening up the view!
Developing Site #2 and #3 before Winter
Developing Site #2 and #3 before Winter
Developing Site #2 and #3 before Winter, this will be a challenge, lots of material and work to do before it freezes too hard!
Developing Site #2 and #3 before Winter
Developing Site #2 and #3 before Winter
Developing Site #2 and #3 before Winter I’ve been encouraged to get this done before Winter by the fact that some folks are coming up from Boise Idaho to take up residence here, so I’m challenged to get a nice space ready for them! This is what it was looking like last Summer after […]
Young musicians record ‘Blue Ice’ at Gre
Young musicians record ‘Blue Ice’ at Grewingk Glacier How cool is this for the complete story follow this link Complete story in the Homer News Since I look right at Grewingk Glacier across the Bay from here I felt I had to post this, this is fantastic….What a great group, and Thanks Johnny B! […]











