Got the front foundation wall ready to frame.
This was a big deal to get done, now I can frame in a 72” rough opening for a double door. Some people are actually interested in this, as for me it’s a journal.
I need the Bituthene primer before I can apply the patch in Bituthene member and backfill the front.