Electrical 200 amp RV Sites sub panel, repositioned in between the studs, after moving 1 stud over since this framing is 12” o.c.now the panel is home and wired
This wiring is temporary, obviously I have to finish the building, so I left myself lots of wire to pull it back out and modify as needed
No Comments Yet