Nice weather with Beautiful snow….
RV Site #2 all plowed and shoveled……
Winter wonderland around here………
All dried in for winter…….
All dried in for winter……. Dave saved the day, and got the deck covered Friday. Not that anyone would notice but the extended section in back and front are pitched deck areas. When the building gets built, those deck areas extend 4’ beyond the outside walls. Although the hip roof will have a 5’ overhang […]
Progress on the Foundation…..
Progress on the Foundation….. moving along slowly and steady, going to try and get the Bituthane on tomorrow after adding to the East Rim Joist, to overhang the, askew framing below, an easy fix to my out of square condition below.
Getting her done in spite of the rain…..
Installing more joist as he can between...
The carpenter is experienced and accurate and this is not a typical floor system install, by any means. He is doing an excellent job! This is exciting, I have been looking forward to this for awhile.
RV Site #1 and #2 are now available…..
In between the rain, setting more floor ...
Getting more joist set in between the rain, some plywood makes a good temporary platform to lay joist and cut blocking. These are 2×12 wood joist not BCI’s… ‘
Setting the first floor joist……
Setting the first floor joist… We don’t like working in the rain, there were flood warnings as well. A few wash outs along East End Road.